| | |
|
|
|
|
STS-26 SPACE SHUTTLE MISSION COVERAGE 2-DVD SET
This 2-DVD set includes 4 hours of extensive coverage marking the return to flight for the space shuttle program. Disc 1 covers the pre-launch activity with Main Engine Installation (2 min), Orbiter Processing Facility Activity (23 min), Solid Rocket Booster Stacking (27 min), TDRS Payload Processing (14 min), Astronaut Orbiter Inspection (2 min), Discovery Rollover to VAB (14 min), Discovery Rollout to Pad 39B (26 min) and the Flight Readiness Firing (7 min). Disc 2 includes the mission highlights (60 min) and the post launch press briefing (60 min). Purchase this DVD for some of the most extensive coverage preceding a launch. Please note that in order to keep costs as low as possible we have eliminated all packaging for this DVD, we use a simple case with a simple label. We know what is most important to you and that is the content. |
Shipping and handling $0.75 shipping for each additional eligible item you buy from shuttlesource. Item location: park city , UT, United States Shipping to: Worldwide
 
*The estimated delivery time is based on the seller's handling time, the shipping service selected, and when the seller receives cleared payment. Sellers are not responsible for shipping service transit times. Transit times may vary, particularly during peak periods. | ||||||||||||||
Return policy
| |||||||
Payment details
Immediate payment required for this item Immediate payment of US $14.99 is required. | ||||||